Hierarchy
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ FVVI (Package) R/3 appl.dev. for Financial Assets Management: Real estate
Attribute
Message class | 62 | ||
Short Description | Message Texts for Real Estate | ||
Message Number | 256 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Help Document
Diagnosis
Consumption for the settlement period could not be determined because one reading is missing.
System Response
The settlement is not carried out.
Procedure
Please enter the missing meter reading.
To carry out a consumption-based settlement, a minimum of two meter readings must exist: the maximum meter reading before the settlement period is used as the initial value. If the meter did not exist before the settlement period, the lowest meter reading in the settlement period is used.
The maximum meter reading in the settlement period is used as the end value.
Zero consumption is permitted. However, the meter readings on various reading dates must be identical in this case. The meter reading date for the initial value must not be identical to the meter reading date of the end value.
The reference date of the meter reading is decisive for the settlement period.
History
Last changed on/by | 20110908 | SAP | |
SAP Release Created in |