SAP ABAP Message Class 29 Message Number 404 (Units of issue for old (&) and new (&) materials are incompatible)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Attribute
Message class 29  
Short Description Bills of Material    
Message Number 404  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Units of issue for old (&) and new (&) materials are incompatible
Help Document

Diagnosis

You want to use mass change to replace a material in BOMs with another material. This is only possible if the old and new material have the same issue unit.
The same applies to the base units of the two materials.

Procedure

You have two options:

  1. Enter another material which has the same issue unit as the material to be replaced.
  2. Check whether the units of measure of the new material need to be changed.
    A material master can only be changed in consultation with the responsible area.

History
Last changed on/by 20100310  SAP 
SAP Release Created in