SAP ABAP Message Class 29 Message Number 262 (Different BOMs for configurable material & exist in plants & and &)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PRO (Application Component) Products
⤷
CS (Package) R/3 Application development: PP Bills of Material
⤷
⤷
Attribute
| Message class | 29 | ||
| Short Description | Bills of Material | ||
| Message Number | |
262 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On |
Message Text
Different BOMs for configurable material & exist in plants & and &
Help Document
Diagnosis
You want to allocate the BOM for a material that was configured with reference to configurable material in plant to plant
However, different BOMs for configurable material exist in plants and . For this reason, you cannot allocate the BOM to the plant.
Procedure
If you want to allocate the configured material to plant , the configurable material must have one BOM in both plants. You must delete the second BOM.
To do this, proceed as follows:
- Check the BOMs for the configurable material in plants and . Decide which BOM plant is relevant to both plants and which BOM you want to delete.
- Delete the BOM from one of the plants (change mode).
- Allocate the BOM for the configurable material to the plant in which you deleted the BOM.
- You can now link the BOM of the configured material to the plant you require.
History
| Last changed on/by | 20100310 | SAP | |
| SAP Release Created in |