SAP ABAP Message Class 29 Message Number 246 (Distribution key & not defined in plant & (item: &))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PRO (Application Component) Products
⤷
CS (Package) R/3 Application development: PP Bills of Material
⤷
⤷
Attribute
| Message class | 29 | ||
| Short Description | Bills of Material | ||
| Message Number | |
246 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On |
Message Text
Distribution key & not defined in plant & (item: &)
Help Document
Diagnosis
You want to allocate the BOM to plant .
Item of the BOM contains a material for which material requirements for repetitive manufacturing and continuous flow production are planned using distribution key .
However, this distribution key is not defined in plant .
Procedure
You can only allocate the BOM to plant if the distribution key is defined in this plant.
History
| Last changed on/by | 20100310 | SAP | |
| SAP Release Created in |