SAP ABAP Message Class 29 Message Number 244 (G/L account & not defined in company code & (plant &) (item: &))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Attribute
Message class | 29 | ||
Short Description | Bills of Material | ||
Message Number | 244 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
G/L account & not defined in company code & (plant &) (item: &)
Help Document
Diagnosis
You want to allocate the BOM to plant . The BOM contains a non-stock item for which a cost element was entered.
The cost element entered refers to a direct cost. In this case, the system checks whether G/L account exists in the determined company code (plant ).
As it does not exist, you cannot allocate the BOM to plant .
Procedure
If you want to allocate the BOM to plant , first you have to maintain G/L account in this plant.
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |