SAP ABAP Message Class 29 Message Number 212 (Material must be same as initial material)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Attribute
Message class 29  
Short Description Bills of Material    
Message Number 212  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Material must be same as initial material
Help Document

Diagnosis

You see this message in one of the following situations:

  1. You want to allocate the BOM for the material you entered on the initial screen to an additional plant.
  2. You want to allocate a configured material to one or more BOMs for the configurable material.

You chose function New allocations. You can only create this allocation for the (configured) material that you entered on the initial screen.

System Response

Procedure

Please correct your entry in the field Material.
You can create additional allocations for the selected (configured) material. For example, you can allocate the (configured) material to the BOM for the configurable material in another plant.

Note on 2.)
If you want to allocate other configured materials to the BOM for the configurable material, you have to create an allocation for each configured material separately (Material BOM -> Alloc. config. mat. -> Create).

History
Last changed on/by 20100310  SAP 
SAP Release Created in