SAP ABAP Message Class 29 Message Number 162 (Material & is locked by &)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Attribute
Message class | 29 | ||
Short Description | Bills of Material | ||
Message Number | 162 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Material & is locked by &
Help Document
Diagnosis
You want to work on the BOM for material . One of the following situations triggered this error message:
- Your are already working on the material master in another session.
- The material master is currently being processed by user .
- The material master has just finished being processed, but the system has not posted it yet.
Procedure
Try to access the BOM for this material later.
If the BOM is locked over a long period of time, ask user why it is locked.
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |