SAP ABAP Message Class 29 Message Number 140 (Base unit of measure & cannot be copied)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PRO (Application Component) Products
     CS (Package) R/3 Application development: PP Bills of Material
Attribute
Message class 29  
Short Description Bills of Material    
Message Number 140  
Documentation status      
Authorization check Error Message      
Changed On    
Message Text
Base unit of measure & cannot be copied
Help Document

Diagnosis

You want to create a BOM by copying an existing BOM (reference).

As the base unit of measure of the reference BOM is different from the base unit of measure of the material for which the new BOM is to be created, it cannot be copied into the new BOM. For this reason, the default base unit of measure for the new BOM is that of the material for which the BOM is being created.

The base unit of measure of a BOM must be the same as for the material is represents.

Procedure

You have two options:

  1. Press ENTER. You see the reference BOM.

  • Select the item you want to copy and choose function Copy. Now the BOM header and all selected items are copied. Only the base unit of measure is reset for the BOM.

  1. If you decide as a result of this warning that you do not want to use this reference BOM, choose function New entry.

  • Correct your entry or cancel the transaction Copy from....

History
Last changed on/by 20100310  SAP 
SAP Release Created in