SAP ABAP Message Class 29 Message Number 082 (BOM status does not allow allocation to operations)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PRO (Application Component) Products
⤷
CS (Package) R/3 Application development: PP Bills of Material
⤷
⤷
Attribute
| Message class | 29 | ||
| Short Description | Bills of Material | ||
| Message Number | |
082 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On |
Message Text
BOM status does not allow allocation to operations
Help Document
Diagnosis
You want to allocate a material component to an operation in a routing. This is only possible if the BOM has a status for which the indicator Released for work scheduling is set in Customizing (BOM status).
The BOM you are editing does not have a status with this indicator.
Procedure
You cannot allocate the material component to a routing until:
- the BOM is given a status with the indicator Released for work scheduling
- the settings in Customizing (BOM status) are changed to include this indicator for the selected status
History
| Last changed on/by | 20100310 | SAP | |
| SAP Release Created in |