SAP ABAP Message Class 29 Message Number 050 (Date & and change no. & determined from revision level &)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PRO (Application Component) Products
⤷
CS (Package) R/3 Application development: PP Bills of Material

⤷

⤷

Attribute
Message class | ![]() |
29 | |
Short Description | ![]() |
Bills of Material | |
Message Number | ![]() |
050 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
Message Text
Date & and change no. & determined from revision level &
Help Document
Diagnosis
You are processing a BOM with reference to revision level .
System Response
The system determines change number , since revision level was assigned for this change number. The valid-from date of the change master record () is displayed.
Procedure
If you confirm this message, you process the BOM with reference to change number .
History
Last changed on/by | ![]() |
20100310 | SAP |
SAP Release Created in |