SAP ABAP Message Class 29 Message Number 049 (A change number was entered, so the revision level is ignored)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PRO (Application Component) Products
⤷
CS (Package) R/3 Application development: PP Bills of Material

⤷

⤷

Attribute
Message class | ![]() |
29 | |
Short Description | ![]() |
Bills of Material | |
Message Number | ![]() |
049 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
Message Text
A change number was entered, so the revision level is ignored
Help Document
Diagnosis
You want to change or display a BOM and have entered both a change number and a revision level.
The revision level is an additional identifier for the change status of a material with reference to a particular change number.
- If you enter a change number, the system determines the valid-from date from the relevant change master record.
- In this case, the system ignores the revision level, even if the change number and the revision level do not refer to the same change status of a material.
Procedure
If you confirm this warning message, you see the item overview.
History
Last changed on/by | ![]() |
20100310 | SAP |
SAP Release Created in |