SAP ABAP Message Class 29 Message Number 049 (A change number was entered, so the revision level is ignored)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Attribute
Message class | 29 | ||
Short Description | Bills of Material | ||
Message Number | 049 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
A change number was entered, so the revision level is ignored
Help Document
Diagnosis
You want to change or display a BOM and have entered both a change number and a revision level.
The revision level is an additional identifier for the change status of a material with reference to a particular change number.
- If you enter a change number, the system determines the valid-from date from the relevant change master record.
- In this case, the system ignores the revision level, even if the change number and the revision level do not refer to the same change status of a material.
Procedure
If you confirm this warning message, you see the item overview.
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |