SAP ABAP Message Class 29 Message Number 049 (A change number was entered, so the revision level is ignored)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PRO (Application Component) Products
⤷
CS (Package) R/3 Application development: PP Bills of Material
⤷
⤷
Attribute
| Message class | 29 | ||
| Short Description | Bills of Material | ||
| Message Number | |
049 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On |
Message Text
A change number was entered, so the revision level is ignored
Help Document
Diagnosis
You want to change or display a BOM and have entered both a change number and a revision level.
The revision level is an additional identifier for the change status of a material with reference to a particular change number.
- If you enter a change number, the system determines the valid-from date from the relevant change master record.
- In this case, the system ignores the revision level, even if the change number and the revision level do not refer to the same change status of a material.
Procedure
If you confirm this warning message, you see the item overview.
History
| Last changed on/by | 20100310 | SAP | |
| SAP Release Created in |