SAP ABAP Message Class 29 Message Number 018 (BOM is allocated to other plants)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Attribute
Message class | 29 | ||
Short Description | Bills of Material | ||
Message Number | 018 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
BOM is allocated to other plants
Help Document
Diagnosis
You want to change the bill of material.
As this BOM is allocated to other plants, the changes become effective in all the plants to which the BOM is allocated.
You see this warning message because the system makes the required checks (such as checking for a material master) in all the plants, and the change you want to make may be rejected. This would be the case, for example, if the material master for a new material item is not maintained in all plants.
Procedure
If you want to make the change, confirm this warning message.
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |