Hierarchy
⤷ CRM-MD-PRO (Application Component) Products
⤷ CS (Package) R/3 Application development: PP Bills of Material
Attribute
Message class | 29 | ||
Short Description | Bills of Material | ||
Message Number | 010 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Help Document
Diagnosis
Since you entered a material for which a BOM already exists, a new alternative is created for the existing BOM (-> multiple BOM).
This means that now you cannot create variants for this material.
System Response
If you entered an alternative, the alternative you entered is created (provided it does not already exist). If you didn't, the system determines the next available alternative and enters this as a default.
Note:
An alternative is exploded according to various criteria: in the material master via the Alternative selection field, and in the BOM via the lot size. You can also use the application to determine that a specific alternative is exploded as of a certain date.
These settings may mean that no alternative is exploded.
Procedure
If you want to confirm creation of a multiple BOM, press ENTER.
History
Last changed on/by | 20100310 | SAP | |
SAP Release Created in |