SAP ABAP Message Class 10 Message Number 032 (Please enter higher scale ratio)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM (Application Component) Customer Relationship Management
     CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
       CIIC (Package) CIM integration: Customizing
Attribute
Message class 10  
Short Description Customizing: Process Industries    
Message Number 032  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 19991014   
Message Text
Please enter higher scale ratio
Help Document

Diagnosis

The value for the scale ratio is too small.

The product of "length/time unit" of the planning period and the "scale ratio" must not be smaller than 0.005. Smaller values are rounded down to zero. This value, however, cannot be further processed by the graphic.

Example

Length/time unit for the planning period:                0.10 mm/day
Scale ratio pre-and postprocessing for planning period:    1.00 %
Product:    0.10 mm/day x 1.00 % = 0.001 mm/day,rounded down to 0.

System Response

Procedure

Choose a smaller time unit for the planning period and a higher value for the length/time unit.

Or choose a bigger scale ratio. For example:
Scale ratio: 5.00 %
Product: 0.10 mm/day X 5.00 % = 0.005 mm/day, rounded up to 0.01.

History
Last changed on/by 19980116  SAP 
SAP Release Created in