SAP ABAP Message Class 10 Message Number 032 (Please enter higher scale ratio)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CIIC (Package) CIM integration: Customizing
⤷ CRM (Application Component) Customer Relationship Management
⤷ CRM_APPLICATION (Package) All CRM Components Without Special Structure Packages
⤷ CIIC (Package) CIM integration: Customizing
Attribute
Message class | 10 | ||
Short Description | Customizing: Process Industries | ||
Message Number | 032 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 19991014 |
Message Text
Please enter higher scale ratio
Help Document
Diagnosis
The value for the scale ratio is too small.
The product of "length/time unit" of the planning period and the "scale ratio" must not be smaller than 0.005. Smaller values are rounded down to zero. This value, however, cannot be further processed by the graphic.
Example
Length/time unit for the planning period: 0.10 mm/day
Scale ratio pre-and postprocessing for planning period: 1.00 %
Product: 0.10 mm/day x 1.00 % = 0.001 mm/day,rounded down to 0.
System Response
Procedure
Choose a smaller time unit for the planning period and a higher value for the length/time unit.
Or choose a bigger scale ratio. For example:
Scale ratio: 5.00 %
Product: 0.10 mm/day X 5.00 % = 0.005 mm/day, rounded up to 0.01.
History
Last changed on/by | 19980116 | SAP | |
SAP Release Created in |