SAP ABAP Message Class /SAPCEM/PT Message Number 255 (The requirement is no longer current. It is being updated.)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ /SAPCEM/DISPO (Package) CEM Planning
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ /SAPCEM/DISPO (Package) CEM Planning
Attribute
Message class | /SAPCEM/PT | ||
Short Description | Messages Planning Board | ||
Message Number | 255 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20050301 |
Message Text
The requirement is no longer current. It is being updated.
Help Document
Diagnosis
You have tried to process a requirement that has been changed by another user in the meantime and is therefore no longer valid.
System Response
The system updates the requirement.
Procedure
After the system has updated the requirement, you can process it.
Procedure for System Administration
Example
You want to schedule requirement 100, item 10. In the meantime, another user has planned the requirement. The data for the requirement that is displayed in the planning board is therefore out of date. After you have confirmed the message, the requirement will be updated in the planning board. Afterwards you can then process the requirement again.
History
Last changed on/by | 20050301 | SAP | |
SAP Release Created in | 46C2 |