SAP ABAP Message Class /SAPCEM/PT Message Number 249 (Operation &1/&2 cannot be processed here (see long text))
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-EC-CEM (Application Component) Construction Equipment Management
⤷
/SAPCEM/DISPO (Package) CEM Planning
⤷
⤷
Attribute
| Message class | /SAPCEM/PT | ||
| Short Description | Messages Planning Board | ||
| Message Number | |
249 | |
| Documentation status | |||
| Authorization check Error Message | |||
| Changed On | 20050301 |
Message Text
Operation &1/&2 cannot be processed here (see long text)
Help Document
Diagnosis
Activity of network/order is not in the current internal worklist for capacity planning. This may have the following reasons:
- the requirement was loaded into the planning board
- the requiement does not belong to the current class (and/or work center )
System Response
Procedure
To edit this requirement you have to enter via class (and/or work center ) for which this requirement is generated.
Procedure for System Administration
Further notes
The system generates the internal worklist for capacity planning once during selection of the planning board.
History
| Last changed on/by | 20050301 | SAP | |
| SAP Release Created in | 46C2 |