SAP ABAP Message Class /SAPCEM/PT Message Number 249 (Operation &1/&2 cannot be processed here (see long text))
Hierarchy
ECC-DIMP (Software Component) DIMP
   IS-EC-CEM (Application Component) Construction Equipment Management
     /SAPCEM/DISPO (Package) CEM Planning
Attribute
Message class /SAPCEM/PT  
Short Description Messages Planning Board    
Message Number 249  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050301   
Message Text
Operation &1/&2 cannot be processed here (see long text)
Help Document

Diagnosis

Activity of network/order is not in the current internal worklist for capacity planning. This may have the following reasons:

  • the requirement was loaded into the planning board
  • the requiement does not belong to the current class (and/or work center )

System Response

Procedure

To edit this requirement you have to enter via class (and/or work center ) for which this requirement is generated.

Procedure for System Administration

Further notes

The system generates the internal worklist for capacity planning once during selection of the planning board.

History
Last changed on/by 20050301  SAP 
SAP Release Created in   46C2