SAP ABAP Message Class /SAPCEM/PT Message Number 218 (Capacity requirements cannot be moved here (-> long text))
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ /SAPCEM/DISPO (Package) CEM Planning
⤷ IS-EC-CEM (Application Component) Construction Equipment Management
⤷ /SAPCEM/DISPO (Package) CEM Planning
Attribute
Message class | /SAPCEM/PT | ||
Short Description | Messages Planning Board | ||
Message Number | 218 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20050301 |
Message Text
Capacity requirements cannot be moved here (-> long text)
Help Document
Diagnosis
You want to change the dates of an open capacity requirement (e.g. network activity). However, this is not allowed in the CEM planning board.
System Response
Procedure
If you want to change the dates anyway you have to do this using the relevant change transaction (such as CN22 - Change network).
Procedure for System Administration
History
Last changed on/by | 20050301 | SAP | |
SAP Release Created in | 46C2 |