SAP ABAP Message Class /CUM/CONMS (CU: CU Project Maintenance)
Basic Data
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   PM-WOC-MO (Application Component) Maintenance Orders
     /CUM/CONMS (Package) Construction Measure
Attributes
Message class /CUM/CONMS
Short Description CU: CU Project Maintenance  
Changed On 20100310 
Last Changed At 131505 
Messages
# Message Message Short Text Documentation status Authorization check
1 000 Error in construction measure type & Space: object requires documentation
2 001 Construction measure & already exists Space: object requires documentation
3 002 Construction measure & is locked by user & Space: object requires documentation
4 003 System: Status object does not exist Space: object requires documentation
5 004 Construction measure & does not exist Space: object requires documentation
6 005 No changes were made Space: object requires documentation
7 006 Construction measure &1 created Space: object requires documentation
8 007 Construction measure &1 changed Space: object requires documentation
9 008 You are not authorized to use transaction & Space: object requires documentation
10 009 Make an entry Space: object requires documentation
11 010 Enter a number within the interval Space: object requires documentation
12 011 WBS element & is not valid. Enter a valid WBS element Space: object requires documentation
13 012 Construction measure & has not been released Space: object requires documentation
14 013 I_VBKZ does not have allowed value & (only I, U, or D is allowed) Space: object requires documentation
15 014 Construction measure &1 deleted Space: object requires documentation
16 015 Plant & is not valid. Enter a valid plant Space: object requires documentation
17 016 Master order & is assigned. You cannot delete construction measure & Space: object requires documentation
18 017 You can only delete construction measures with status CRTD or DLT Space: object requires documentation
19 018 Status & set in construction measure &. Update not allowed Space: object requires documentation
20 019 Order & is assigned. You cannot delete construction measure & Space: object requires documentation
21 020 Design & is assigned. You cannot delete construction measure & Space: object requires documentation
22 021 Documents are linked. Construction measure & cannot be deleted Space: object requires documentation
23 022 Master order & is not valid Space: object requires documentation
24 023 Notification & is not valid Space: object requires documentation
25 024 Master order & is in different plant & (plant for CM is &) Space: object requires documentation
26 025 Plant & is different to plant & of master order Space: object requires documentation
27 026 Construction measure & does not exist. Enter a valid constr. measure Space: object requires documentation
28 027 Construction measure & has status & and cannot be allocated to design Space: object requires documentation
29 028 Construction measure & has a different CM type & The short text describes the object sufficiently
30 029 WBS element &1 has been copied from contruction measure &2 The short text describes the object sufficiently
31 030 Check WBS element assignment! (CM assigned to different WBS element &1) The short text describes the object sufficiently
32 031 Construction measure & will be released after saving The short text describes the object sufficiently
History
Last changed on/by 20100310  SAP 
SAP Release Created in   200