SAP ABAP Interface INTF_BADI_PS_PROJ_CURR_CHANGE (Interface for BAdI: BADI_PS_PROJ_CURRENCY_CHANGE)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
PS-ST (Application Component) Structures
⤷
PSI_LEAN (Package) PS Integration with Lean Assembly

⤷

⤷

Meta Relationship - Used By
# | Relationship type | Used by | Short Description | Created on |
---|---|---|---|---|
1 | Interface implementation (CLASS c. INTERFACES i_ref) | CL_PS_PROJ_CURR_CHANGE | Class for BAdI: BADI_PS_PROJ_CURRENCY_CHANGE | 20100127 |
Properties
Interface | INTF_BADI_PS_PROJ_CURR_CHANGE | |
Short Description | Interface for BAdI: BADI_PS_PROJ_CURRENCY_CHANGE |
General Data
Package | PSI_LEAN | PS Integration with Lean Assembly |
Created | 20100118 | SAP |
Last changed | 20100310 | SAP |
Unicode checks active |
Forward declarations
Interface INTF_BADI_PS_PROJ_CURR_CHANGE has no forward declaration.
Interfaces
# | Interface | Abstract | Final | Description | Created on |
---|---|---|---|---|---|
1 | IF_BADI_INTERFACE | Tag Interface for BAdIs | 20100118 |
Friends
Interface INTF_BADI_PS_PROJ_CURR_CHANGE has no friend.
Attributes
Interface INTF_BADI_PS_PROJ_CURR_CHANGE has no attribute.
Methods
# | Method | Level | Visibility | Method type | Description | Created on |
---|---|---|---|---|---|---|
1 | ![]() |
Instance method | Public | Method | Change Project Currency | 20100118 |
Events
Interface INTF_BADI_PS_PROJ_CURR_CHANGE has no event.
Types
Interface INTF_BADI_PS_PROJ_CURR_CHANGE has no local type.
Method Signatures
Method CHANGE_PROJ_CURRENCY Signature
# | Type | Parameter | Pass Value | Optional | Typing Method | Associated Type | Default value | Description | Created on |
---|---|---|---|---|---|---|---|---|---|
1 | ![]() |
CV_PROJ_CURRENCY | Call by reference | Type reference (TYPE) | PS_PWHIE | Project Currency | 20100118 | ||
2 | ![]() |
IS_SALES_DOC | Call by reference | Type reference (TYPE) | VBAK | Sales Document | 20100122 | ||
3 | ![]() |
IT_SALES_DOC_ITEMS | Call by reference | Type reference (TYPE) | VBAP_T | Sales Document Items | 20100118 |
Method CHANGE_PROJ_CURRENCY on Interface INTF_BADI_PS_PROJ_CURR_CHANGE has no exception.
History
Last changed by/on | SAP | 20100310 |
SAP Release Created in | 605 |