SAP ABAP Data Element XZFAE (Indicator: Payment per Due Day)
Hierarchy
SAP_FIN (Software Component) SAP_FIN
   FI-BL-PT (Application Component) Payment Transactions
     BFIBL_CHECK_D (Package) Payment : General Section
Basic Data
Data Element XZFAE
Short Description Indicator: Payment per Due Day  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short  
Medium  
Long 30 Payment per due day 
Heading  
Documentation

Definition

Indicator which specifies that only items that are due on the same day will be paid with a single payment.

Use

The due date of the paid items (the same for all of them) is stored in the header record of the payment. This date can be referred to in the payment medium print and in the data medium exchange, in order, for example, to pass on an individual run date to the bank for every payment.

Special features

If the due date of an item is earlier than the posting date of the payment run, it is replaced by the payment run posting date. This ensures that all items which are overdue on the posting date are paid with a single payment.

The baseline date for determining the value date is the due date of the payment and not, as was previously the case, the posting date of the payment.

Even though the total items to be paid may give a credit balance, which would require an outgoing payment, it is possible that there is a debit balance for certain due dates. In this case, the items due on that date are paid together with the items from the next available due date.

Examples

Invoice      1000    due      02/10/95 
Credit memo 500 due 02/11/95
Invoice 200 due 02/11/95
Invoice 700 due 02/12/95

Grouping these items by due date results in the following arrangement:

02/10/1995    balance   1000    can be paid 
02/11/1995 balance 300- cannot be paid
02/12/1995 balance 700 can be paid

In the above case, the items from the 02/11/95 would be grouped with the items from the 02/12/95, resulting in the following payments:

02/10/1995    balance   1000    can be paid 
02/12/1995 balance 400 can be paid
History
Last changed by/on SAP  19990223 
SAP Release Created in