SAP ABAP Data Element XCLOSING_DATE_FOR_VSOP (Indicator: Take Account of Order Deadline for Shipping Order)
Hierarchy
IS-M (Software Component) SAP MEDIA
   IS-M (Application Component) SAP Media
     JSD (Package) Appl. dev. R/3 Publishing Sales and Distribution System
Basic Data
Data Element XCLOSING_DATE_FOR_VSOP
Short Description Indicator: Take Account of Order Deadline for Shipping Order  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Ord.DLine 
Medium 15 Ord.DLine Act. 
Long 20 Order Deadline Act. 
Heading OD 
Documentation

Definition

This indicator controls the degree of detail to which the order deadline is taken into account in the shipping order.

Use

If the indicator is selected, the order deadline for each individual shipping order item is taken into account during delivery viability determination and circulation planning.

This means the system takes account of the lead date

  • for each item in the shipping order during delivery viability determination
  • for each delivery during circulation planning

If the indicator is not selected, the order deadline is not taken into account during delivery viability determination in the shipping order. Circulation planning is only performed for an order if the order deadline has not yet been reached for any of the items.

Example

If you define your shipping orders in such a way that all the items in an order have the same delivery viability set and the shipping order is used for one-time shipping (for example, using an address file), you do not need to select this indicator.

If different delivery types (with different lead dates) can occur within one shipping order and the items cover a long period, it is advisable to select this indicator.

History
Last changed by/on SAP  20050411 
SAP Release Created in 600