SAP ABAP Data Element X_PLAN_VOR_PER (Target Scrap Quantity in Previous Periods)
Hierarchy
☛
SAP_FIN (Software Component) SAP_FIN
⤷ CO-PC-OBJ-PER (Application Component) Product Cost by Period
⤷ KKPK (Package) Product Cost Collector: Master Data/Processing
⤷ CO-PC-OBJ-PER (Application Component) Product Cost by Period
⤷ KKPK (Package) Product Cost Collector: Master Data/Processing
Basic Data
Data Element | X_PLAN_VOR_PER |
Short Description | Target Scrap Quantity in Previous Periods |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | MENG13 | |
Data Type | QUAN | Quantity field, points to a unit field with format UNIT |
Length | 13 | |
Decimal Places | 3 | |
Output Length | 17 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Scrap |
Medium | 15 | Target scrap |
Long | 25 | Target scrap prev.periods |
Heading | 25 | Target scrap prev.periods |
Documentation
Definition
Planned scrap quantity for a reporting point (operation) that was converted to the confirmed yield for each reporting point.
Use
Indicates the scrap quantity that was expected on the basis of the planned values and the confirmed yield for each operation.
Dependencies
You can enter planned scrap quantities in the routing. Such planned scrap quantities do not result in actual scrap costs.
In variance calculation, the target scrap quantity is used in the calculation of the scrap.
See also:
History
Last changed by/on | SAP | 19990310 |
SAP Release Created in |