SAP ABAP Data Element WTY_CHECK_DATE (Date on Which Warranty is Checked)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   LO-WTY (Application Component) Warranty Claim Processing
     ISAUTO_WTY_MWTY (Package) Warranty Master Warranty / Warranty Check Master Warranty
Basic Data
Data Element WTY_CHECK_DATE
Short Description Date on Which Warranty is Checked  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DATUM    
Data Type DATS   Date field (YYYYMMDD) stored as char(8) 
Length 8    
Decimal Places 0    
Output Length 10    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Check Date 
Medium 15 Check Date 
Long 20 Check Date 
Heading 20 Check Date 
Documentation

Definition

The warranty check date is usually the reference date of the warranty claim.

If there is no reference date, the system date is set.

Use

The system checks whether the date is within the warranty validity period and determines a measurement document with measurement readings for this date.

Dependencies

Example

History
Last changed by/on SAP  20030326 
SAP Release Created in 471