SAP ABAP Data Element WORK_DAY (Take factory calendar into account)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-BF-PS (Application Component) Portioning and scheduling
⤷ EE15 (Package) IS-U: Scheduling
⤷ IS-U-BF-PS (Application Component) Portioning and scheduling
⤷ EE15 (Package) IS-U: Scheduling
Basic Data
Data Element | WORK_DAY |
Short Description | Take factory calendar into account |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | KENNZX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Incl. FC |
Medium | 15 | Include FC |
Long | 20 | Include factory cal. |
Heading | 2 | FC |
Documentation
Use
Means that the factory calendar specified in this portion is taken into account when the day-based period length is calculated in workdays.
Example
The period length is 20 days. The start date of the period is 01/01/1999.
- If you mark this field and do not enter a factory calendar in the Factory Cal.ID field, the system determines the end date 01/20/1999.
Non-working days are also taken into account during the calculation.
- If you select this field and enter factory calendar 01 (standard factory calendar for Germany), the system determines the end date 02/01/1999.
Only work days are taken into account during the calculation.
History
Last changed by/on | SAP | 20050224 |