SAP ABAP Data Element WORK_DAY (Take factory calendar into account)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BF-PS (Application Component) Portioning and scheduling
     EE15 (Package) IS-U: Scheduling
Basic Data
Data Element WORK_DAY
Short Description Take factory calendar into account  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type KENNZX    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Incl. FC 
Medium 15 Include FC 
Long 20 Include factory cal. 
Heading FC 
Documentation

Use

Means that the factory calendar specified in this portion is taken into account when the day-based period length is calculated in workdays.

Example

The period length is 20 days. The start date of the period is 01/01/1999.

  • If you mark this field and do not enter a factory calendar in the Factory Cal.ID field, the system determines the end date 01/20/1999.

    Non-working days are also taken into account during the calculation.

  • If you select this field and enter factory calendar 01 (standard factory calendar for Germany), the system determines the end date 02/01/1999.

    Only work days are taken into account during the calculation.

History
Last changed by/on SAP  20050224 
SAP Release Created in