SAP ABAP Data Element WEZUO (Indicator: GR with Reference to Vendor Confirmation)
Hierarchy
BBPCRM (Software Component) BBPCRM
   SRM-EBP (Application Component) Enterprise Buyer
     BBP_APPLICATION (Package) Structure Package EBP
       ME (Package) Application development R/3 Purchasing
Basic Data
Data Element WEZUO
Short Description Indicator: GR with Reference to Vendor Confirmation  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type XFELD    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 GR Assgt 
Medium 15 GR Assignment 
Long 20 GR Assignment 
Heading
Documentation

Definition

In the case of a PO item with several confirmations, this indicator ensures that goods receipts are assigned to the relevant confirmation in each case.

Use

Assignment to confirmations received at the time of goods receipt (GR) means that the quantity from the associated confirmation will be suggested in the GR and that the GR reduces or cancels out precisely the relevant confirmation in the stock/requirements list.

You can use GR assignment only for confirmation categories that are GR-relevant.

Note

Note that you can only post a goods receipt if a confirmation (e.g. an inbound delivery) has already been entered.
If goods receipt takes place before inbound delivery, you cannot post the goods receipt because the GR cannot then be assigned to an inbound delivery.

Example

Assume you have a PO item covering 100 tons of "Steel 1". You have been notified of two inbound deliveries of 50 tons each. The system will assign each of the subsequent goods receipts to the relevant inbound delivery.

When you post a goods receipt, it is not the total quantity from the PO item (here 100 tons) that appears as the default (suggested) quantity. Instead, the default data will be taken from the inbound deliveries of the item (in this case, the system will provide two default quantities of 50 tons each).

Dependencies

If the batch split realized in the inbound delivery is to be taken into account at the time of goods receipt, you must set the GR assignment indicator for the confirmation category "inbound delivery".

Example

History
Last changed by/on SAP  19990115 
SAP Release Created in