SAP ABAP Data Element WERKS_R (Plant)
Hierarchy
ECC-DIMP (Software Component) DIMP
   IS-AD-GPD (Application Component) Pegging, Grouping, and Distribution
     ATBLP (Package) Transfer/Borrow-loan-payback dev class A
Basic Data
Data Element WERKS_R
Short Description Plant  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type WERKS    
Data Type CHAR   Character String 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table T001W    
Further Characteristics
Search Help: Name H_T001W    
Search Help: Parameters WERKS   
Parameter ID WRK  
Default Component name PLANT   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Plant 
Medium 15 Plant 
Long 20 Plant 
Heading Plnt 
Documentation

Definition

Key that uniquely identifies a plant.

Use

The production plant where the material is to be produced is entered for production and process orders.

Supplementary Documentation - WERKS_REF 0001

Procedure

Enter the plant to which you wish to limit the selection.

Supplementary Documentation - WERKS_REF 0002

Procedure

Enter the plant in which you wish to perform a planning run.

Supplementary Documentation - WERKS_REF 0003

Use

The conditions for the release strategy only affect the specified plant.

Supplementary Documentation - WERKS_REF 0004

Procedure

Enter the number of a plant if you only want to process the purchase order item for that specific plant.

If you do not enter a plant, the purchase order items will be suggested for processing independently of the plant.

Supplementary Documentation - WERKS_REF 0005

Use

This is the plant for which the planning run has been carried out.

Supplementary Documentation - WERKS_REF 0006

Use

This is the plant in which the material component is to be provided.

Supplementary Documentation - WERKS_REF 0007

Use

Number of the plant that is to receive or issue the goods.

Procedure

Any value that you enter in this field will appear in each item as the default value.

Supplementary Documentation - WERKS_REF 0008

Procedure

Enter a value in this field if you only want to process those reservation items that satisfy this criterion.

Supplementary Documentation - WERKS_REF 0009

Procedure

Enter the number of the plant in which the physical inventory is to be carried out.

Supplementary Documentation - WERKS_REF 0010

Use

Depending on the movement type, this is the plant that is to receive or issue the goods.

Supplementary Documentation - WERKS_REF 0011

Procedure

Enter the number of the plant for which you wish to see the list.

Supplementary Documentation - WERKS_REF 0012

Use

Number of the plant in which goods movement is to take place.

Supplementary Documentation - WERKS_REF 0013

Procedure

Enter a value in this field if you want to search for purchase orders that satisfy this criterion.

Supplementary Documentation - WERKS_REF 0014

Procedure

Enter a value in this field if you only want to process those reservation items that satisfy this criterion.

Supplementary Documentation - WERKS_REF 0015

Use

Number of the plant in which the inventory is performed.

Supplementary Documentation - WERKS_REF 0016

Procedure

Please enter the upper interval limit, that is, the value that indicates that selection should stop.

Supplementary Documentation - WERKS_REF 0017

Use

Procedure

Enter the plant in which you wish to create, change or display a run schedule header.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0018

Procedure

Enter the plant key of the reference quota arrangement.

Supplementary Documentation - WERKS_REF 0019

Procedure

Enter the number of the plant for which you wish to display the source list records for the respective material.

Supplementary Documentation - WERKS_REF 0020

Procedure

Enter the plant key of the reference source list.

Supplementary Documentation - WERKS_REF 0021

Procedure

Enter the number of the plant for which you wish to carry out, change or display the individual forecast.

Supplementary Documentation - WERKS_REF 0022

Use

This plant is the plant where the material is to be processed.

The plant is copied into the task list header as the default value when creating a plan without reference. You can change it there and it determines the plant in which the plan is valid.

The plan in the task list header is copied into the operation as the default value. If the operations are performed in another plant, you can overwrite the default value.

Supplementary Documentation - WERKS_REF 0023

Use

Key of the plant to which the work center belongs.

Procedure

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0024

Use

Number of the plant for which you want to perform an evaluation.

Supplementary Documentation - WERKS_REF 0025

Procedure

Enter the number of a plant for which you wish to define master conditions.

These master conditions are included in the effective price of the purchase order items that have been ordered for the plant entered.

Supplementary Documentation - WERKS_REF 0026

Use

Procedure

Enter the plant for which you wish to display or change the master plan for repetitive manufacturing.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0027

Procedure

Enter the lower interval limit here, that is, the value from which selection is to begin.

Supplementary Documentation - WERKS_REF 0028

Use

Enter the plant in which the repairable spares to be refurbished are located.

Procedure

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0030

Use

Procedure

Enter a plant to restrict the determination and display of the stock figures for this plant.

Examples

Dependencies

When reading the inventory data, only the plants for which you have the appropriate display authorization will be taken into account.

Supplementary Documentation - WERKS_REF 0031

Use

In this field enter the number of the plant in which the material is stored.

Dependencies

Example

Supplementary Documentation - WERKS_REF 0032

Procedure

You can enter your selection criteria for this field in the following ways:

  • You enter an individual value in this field.
  • You enter an interval of values in this field and in the adjacent field.
  • You enter several intervals.

All source list records that satisfy your selection criteria will be displayed.

Supplementary Documentation - WERKS_REF 0033

Procedure

You can enter your selection criteria for this field in the following ways:

  • You enter an individual value in this field.
  • You enter an interval of values in this field and in the adjacent field.
  • You enter several intervals.

All purchasing info records that satisfy your selection criteria will be displayed.

Supplementary Documentation - WERKS_REF 0034

Procedure

You can enter your selection criteria for this field in the following ways:

  • You enter an individual value in this field.
  • You enter an interval of values in this field and in the adjacent field.
  • You enter several intervals.

All quota arrangement records that satisfy your selection criteria will be displayed.

Supplementary Documentation - WERKS_REF 0035

Use

Procedure

You have the following options for entering your selection criteria for this field:

  • Enter an individual value in this field.
  • Enter an interval of values (from - to) in this and the adjacent field.
  • Click on the arrow next to the field to enter several intervals or individual values.

All documents that satisfy your selection criteria will be displayed. (Copied from TX,SELECT_CRITERIA)

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0036

Use

Procedure

You have the following options for entering your selection criteria for this field:

  • Enter an individual value in this field.
  • Enter an interval of values (from - to) in this and the adjacent field.
  • Click on the arrow next to the field to enter several intervals or individual values.

All stock balances that satisfy your selection criteria will be displayed. (Copied from TX,SELECT_CRITERIA)

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0037

Use

Procedure

You have the following options for entering your selection criteria for this field:

  • Enter an individual value in this field.
  • Enter an interval of values (from - to) in this and the adjacent field.
  • Click on the arrow next to the field to enter several intervals or individual values.

All data that satisfies your selection criteria will be displayed. (Copied from TX,SELECT_CRITERIA)

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0038

Use Asset Accounting

Use this field to assign the asset to a plant.

For more information see: System Administration Guide

Procedure

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0039

Procedure

Enter the number of a plant if you only want to process the order items for that certain plant.

If you do not enter a plant, the order items will be suggested for processing independently of the plant.

Supplementary Documentation - WERKS_REF 0040

Use

Enter the name of the plant to which the product group needs to be assigned.

Procedure

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0041

Use

Procedure

Enter the plant in which you wish to execute the batch where-used list.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0050

Procedure

Enter the plant for which you wish to create or edit the bill of material.
You can extend the spatial validity of the BOM by assigning it to one or more plants.

Supplementary Documentation - WERKS_REF 0051

Procedure

Enter the plant for which you wish to explode the bills of material.

Supplementary Documentation - WERKS_REF 0052

Use

Enter the plant for which you wish to determine the use of a material in bills of material.

Supplementary Documentation - WERKS_REF 0053

Use

Procedure

Enter the plant to which you wish to assign the BOM.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0057

Use

Procedure

Enter the plant in which the mass change is to take place.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0060

Procedure

Enter the plant in which the material BOM with this change number needs to be changed.

Supplementary Documentation - WERKS_REF 0061

Use

The key in this field indicates the plant in which the operation is performed.

Procedure

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0062

Use

Procedure

In this field you need to enter the key of the supplying or production plant for the special procurement types of cross-plant planning.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0070

Use

Procedure

Enter the plant in which the mass change is to be carried out.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0075

Use

Enter the plant for the work center in this field.

Dependencies

Example

Supplementary Documentation - WERKS_REF 0080

Procedure

Here you determine which plant to select PI sheets for.

Use the selection options to determine how the value entered is to be interpreted (for example, as a single value or as an interval limit).

Supplementary Documentation - WERKS_REF 0081

Use

This entry determines the plant for which process messages are to be selected.

The way in which the value entered is interpreted (for example, as a single value or as an interval limit) depends on

  • whether you maintain the field only in the left column or also in the right
  • which selection option you choose for the value

Supplementary Documentation - WERKS_REF 0082

Procedure

Enter the plant from which you wish to define a planning calendar for this profile.

Supplementary Documentation - WERKS_REF 0083

Use

For production and process orders, this plant is the production plant in which the material is to be processed.

Supplementary Documentation - WERKS_REF 0084

Use

For process orders, this plant is the production plant in which the material is to be processed.

Supplementary Documentation - WERKS_REF 0100

Use

Procedure

Enter the plant to which you wish to assign the bill of material.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0145

Use (Asset Accounting)

Using plant assignment in the asset master record, you can carry out plant-related evaluations in Asset Accounting.

Procedure

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0600

Use

Plant to which the order is assigned.

You have to assign CO production orders to a plant as soon as you create them in the initial screen.

Procedure

Examples

Dependencies

Supplementary Documentation - WERKS_REF 0700

Use

Procedure

Enter the plant in which you want the plan to be valid.

Examples

Dependencies

The plant is copied as the default value in the operations. If the operations are to be carried out in a different plant, you can change the default value in the process.

Note: All the plants in a routing must be in the same company code.

Supplementary Documentation - WERKS_REF 0701

Use

Procedure

Enter the plant in which the operation is to be carried out.

Examples

Dependencies

The plant is copied as the default value from the header data of the routing. If the operations are to be carried out in a different plant, you can change the default value in the operation.

Note: All the plants in a routing must be in the same controlling area.

Supplementary Documentation - WERKS_REF 1000

Use

Procedure

Enter the plant in which the bills of material marked with the deletion flag are to be deleted.

Examples

Dependencies

Supplementary Documentation - WERKS_REF 1008

Use

The Plant field contains a 4-digit code that represents a plant, branch or operating unit within a company.

This field is optional. Plant information is for reference purposes only, and you do not have to provide it.

Procedure

In CREATE mode, use this field to identify the plant where the organizational unit you are working with belongs. To do so either:

  • type in the appropriate 4-digit code, or
  • request a list of plant codes and make a selection by either:
    . pressing F4, or
    . clicking on the down arrow

In CHANGE mode, enter a different plant code by typing over the existing one, or by requesting a list using the methods outlined above.

Supplementary Documentation - WERKS_REF 4000

Definition

Plant of the material to be produced.

Use

Procedure

Examples

Dependencies

The material must not be assigned to the same plant as the recipe; that is the planning plant (from a Materials Management view) and the production plant must be different.

Supplementary Documentation - WERKS_REF 4200

Definition

Key for the plant to which the master recipe belongs.

Supplementary Documentation - WERKS_REF 4210

Definition

Plant to which the resource network belongs.

Dependencies

This value is copied from the resource network.

Supplementary Documentation - WERKS_REF 4410

Definition

Key for the plant to which the resource belongs.

Supplementary Documentation - WERKS_REF 5000

Use

For production orders, this is the production plant in which the material is to be produced.

Supplementary Documentation - WERKS_REF 5100

Definition

Plant in which goods receipt takes place for the finished material after order execution.

Use

If the planning and production plant are identical, the planning plant does not need to be entered separately. The production plant is copied automatically.

Examples

The planning plant can, for example, be used if sales and distribution is to be organized as an independent plant.

History
Last changed by/on SAP  20050301 
SAP Release Created in