SAP ABAP Data Element WDRD_LEVEL_S (Level for Determining the Receiving Plants)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
Basic Data
Data Element | WDRD_LEVEL_S |
Short Description | Level for Determining the Receiving Plants |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WDRD_LEVEL | |
Data Type | NUMC | Character string with only digits |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Level |
Medium | 15 | Level |
Long | 26 | Plant Determination Level |
Heading | 4 | Lvl |
Documentation
Definition
You use this field to control the level at which the system determines the receiving plants.
You have the following options:
- (Issuing) plant
- Material group
- Material
Some of the possible checks (depending on the method selected) cannot be carried out for every one of the selected levels.
- Determination at plant level is advisable when the quantity of the receiving plants is the same for all the materials in the issuing plant that are relevant to the forecast scenario.
- Determination at material group level is advisable when the quantity of the receiving plants is the same for all materials in the issuing plant that are relevant to the forecast scenario within a material group.
- Determination at material level is advisable when the quantity of the receiving plants can be different for all materials in the issuing plant that are relevant to the forecast scenario.
The more specific the level selected for determination, the more performance-intensive and time-consuming the determination, and the greater the need for memory space. You should therefore select the most general level possible.
History
Last changed by/on | SAP | 20050428 |
SAP Release Created in | 110 |