SAP ABAP Data Element WDRD_CHK_WRF3 (Delivery Relationship: Supplying Plant Check)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
Basic Data
Data Element | WDRD_CHK_WRF3 |
Short Description | Delivery Relationship: Supplying Plant Check |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WDRD_CHK_WRF3 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Sup.Plants |
Medium | 15 | Supply Plants |
Long | 20 | Supply Plants Check |
Heading | 6 | SupPln |
Documentation
Definition
You use this indicator to define whether issuing plants are to be included when determining the receiving plants.
You have the following options:
- Do not check the supplying plants
- Only include issuing plants that are not assigned a priority
- Only include issuing plants that are assigned no priority or priority 1
- Include all issuing plants
- Include all issuing plants and check the priority using the user exit for issuing plant determination
- Include all issuing plants and check the priority using a listing check and the user exit for issuing plant determination
As the issuing plants check can take up a lot of runtime, you should only set the scope of the check in as far as is actually relevant to source determination.
To determine receiving plants using the recipient determination method, you must set either the issuing plants check or the source list entries check. Determination of receiving plants at plant level or material group level requires the issuing plants check, but the priority check is not possible in this case.
History
Last changed by/on | SAP | 20050428 |
SAP Release Created in | 110 |