SAP ABAP Data Element WDRD_CHK_MMSTA (Delivery Relationship: Plant-Specific Material Status Check)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
Basic Data
Data Element | WDRD_CHK_MMSTA |
Short Description | Delivery Relationship: Plant-Specific Material Status Check |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WDRD_CHKBX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Mat.Status |
Medium | 15 | Material Status |
Long | 40 | Plant-Specific Material Status Check |
Heading | 6 | MatSt. |
Documentation
Definition
You use this indicator to define whether the plant-specific material status is to be taken into account when determining the receiving plants.
You have the following options:
- Do not check the plant-specific material status.
- Check the plant-specific material status.
A receiving plant only counts as such if the material for this plant is not locked for purchasing or planning. You can carry out different checks on the plant-specific material status using a customer exit.
As the plant-specific material status check can take up a lot of runtime, you should only activate it if it is actually relevant to the delivery relationship.
History
Last changed by/on | SAP | 20050428 |
SAP Release Created in | 110 |