SAP ABAP Data Element WDRD_CHK_KORDB (Delivery Relationship: Source List Requirement Check)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
⤷ MM-CBP (Application Component) Consumption-Based Planning (See Also PP-MRP)
⤷ WEFF (Package) Retail: Extended Forecast Functions
Basic Data
Data Element | WDRD_CHK_KORDB |
Short Description | Delivery Relationship: Source List Requirement Check |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | WDRD_CHKBX | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | SLRq |
Medium | 16 | Source list |
Long | 24 | Source List Req. Check |
Heading | 6 | SLRq |
Documentation
Definition
You use this indicator to determine whether the source list requirement in the master data for the plant is to be taken into account when determining the receiving plants.
You have the following options:
- Do not take the source list requirement into account.
- Take the source list requirement into account.
If there is a source list requirement in a receiving plant, this plant only counts as such if a source list entry exists for this plant and the receiving plant currently being checked.
This check is only useful if determination of the receiving plants includes the supplying plants check.
As the source list requirement check can take up a lot of runtime, you should only activate the check if it is actually relevant to source determination.
History
Last changed by/on | SAP | 20050428 |
SAP Release Created in | 110 |