SAP ABAP Data Element W_MDPER (Markdown period in calendar days)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PCT (Application Component) Product Catalog
     WAKT (Package) Application development R/3 Promotions
Basic Data
Data Element W_MDPER
Short Description Markdown period in calendar days  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type INT2    
Data Type INT2   2-byte integer, only for length field before LCHR or LRAW 
Length 5    
Decimal Places 0    
Output Length 5    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Cal.days 
Medium 15 Calendar days 
Long 20 Calendar days 
Heading CDays 
Documentation

Definition

Number of calendar days after the start date of mark-down planning.

You should reduce the price of a material by a certain percentage rate after this period has been processed. The value must be always be greater than zero.

History
Last changed by/on SAP  20130529 
SAP Release Created in