SAP ABAP Data Element W_MDPER (Markdown period in calendar days)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PCT (Application Component) Product Catalog
⤷
WAKT (Package) Application development R/3 Promotions
⤷
⤷
Basic Data
| Data Element | W_MDPER |
| Short Description | Markdown period in calendar days |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | INT2 | |
| Data Type | INT2 | 2-byte integer, only for length field before LCHR or LRAW |
| Length | 5 | |
| Decimal Places | 0 | |
| Output Length | 5 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Cal.days |
| Medium | 15 | Calendar days |
| Long | 20 | Calendar days |
| Heading | 5 | CDays |
Documentation
Definition
Number of calendar days after the start date of mark-down planning.
You should reduce the price of a material by a certain percentage rate after this period has been processed. The value must be always be greater than zero.
History
| Last changed by/on | SAP | 20130529 |
| SAP Release Created in |