SAP ABAP Data Element VPACKSUM (Use of Packing Instruction in Control Cycle for SumJCs)
Hierarchy
ECC-DIMP (Software Component) DIMP
   IS-A (Application Component) Industry Solution Automotive
     ISAUTO_MD05 (Package) ISAUTO: Development Class KANBAN
Basic Data
Data Element VPACKSUM
Short Description Use of Packing Instruction in Control Cycle for SumJCs  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type VPACKSUM    
Data Type CHAR   Character String 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Use PIs 
Medium 15 Use PIs 
Long 20 Use Pack.Instruction 
Heading 10 Use PIs 
Documentation

Definition

Controls how the packing instruction is used in control cycles for KANBAN summarized JIT calls.

Use

Only packing instructions that refer to 1 single material can be used.

If a packing instruction is entered into the control cycle, the name of the load carrier will be copied into the load carrier field in the control cycle.

The cumulative target quantity is determined from the packing instructions through the specifications: call quantity from packing instruction, one LC per call item, and call quantity from packing instruction, multiple LCs per call item possible . The quantity from the control cycle will then be overwritten.

Dependencies

Consequences in the control cycle:

  • No functional usage, the packing instruction is a comment

    No more consequences

  • Call quantity from rule basis, multiple load carriers possible

    If a call item consists of multiple load carriers, then that number of load carriers will be determined for the call. If you are working with a summary of summarized JIT calls, the number of load carriers, plus the call quantity for an existing call item will be summated.

  • Call quantity from packing instruction, an LC for every call item

    Any number of load carriers can be entered. The corresponding number of call items will be determined and requested on generation of the calls.

    In automatic supply-to-production, this setting causes the replenishment proposals to be split. That is, one replenishment proposal always corresponds to the quantity of one load carrier.

History
Last changed by/on SAP  20050301 
SAP Release Created in 46C