SAP ABAP Data Element VIDAT_VEDA (Installation date)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
Basic Data
Data Element | VIDAT_VEDA |
Short Description | Installation date |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | DATUM | |
Data Type | DATS | Date field (YYYYMMDD) stored as char(8) |
Length | 8 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | INST_DATE | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Inst.date |
Medium | 15 | Installat.date |
Long | 20 | Installation date |
Heading | 10 | Inst. date |
Documentation
Procedure
Enter the date on which the piece of equipment is installed at the customer location.
Use
The installation date can then used as the baseline date for determining other dates in the contract.
Example
A maintenance contract for a photocopier is to be begin on the first of the month after the machine has been installed at the customer location. You leave the contract start date field in the contract blank. However, you enter a date rule for the contract start date which has the installation date as its baseline date. The photocopier is installed on 03.13.95. When you enter this date in the system, the contract start date 04.01.95 is determined automatically and entered in the contract.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |