SAP ABAP Data Element VERSVLEVS (Shipping lead time in days for first shipment)
Hierarchy
IS-M (Software Component) SAP MEDIA
   IS-M (Application Component) SAP Media
     JSD (Package) Appl. dev. R/3 Publishing Sales and Distribution System
Basic Data
Data Element VERSVLEVS
Short Description Shipping lead time in days for first shipment  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DEC3    
Data Type DEC   Counter or amount field with comma and sign 
Length 3    
Decimal Places 0    
Output Length 3    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 SLead(day) 
Medium 15 Ship.lead(days) 
Long 20 Shipping lead days 
Heading SLD 
Documentation

Definition

The shipping lead time in days for initial shipment is used to calculate the first date of shipment for an issue. This date is calculated by subtracting the lead time from the publication date. If the lead time is zero, the date of the initial shipment is the same as the publication date.

History
Last changed by/on SAP  20050224 
SAP Release Created in