SAP ABAP Data Element VBASD_VEDA (Baseline date for indirect date determination)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
Basic Data
Data Element | VBASD_VEDA |
Short Description | Baseline date for indirect date determination |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | VBASD | |
Data Type | CHAR | Character String |
Length | 2 | |
Decimal Places | 0 | |
Output Length | 2 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | BaselineDt |
Medium | 15 | Baseline date |
Long | 20 | Baseline date |
Heading | 0 |
Documentation
Procedure
Enter a reference date such as the signing of the contract date which you want the system to use to calculate a related date such as the contract end date. The system then bases its calculations for the required date on this reference date and the specified time period and/or calendar ID.
Example
The customer hires a photocopier from you. The contract for the use and maintenance of this photocopier is to end one year after the contract is signed. The system calculates the end of contract date as follows:
Baseline date = Date contract signed = 05/23/1995
Time period = 1 year = 05/23/1996
Calendar = Months end
Contract end date = 05/31/1996
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |