Hierarchy
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
Basic Data
Data Element | VASCH_VEDA |
Short Description | Activity at end of contract |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | AKTVT | |
Data Type | CHAR | Character String |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table | TVAS |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | CONT_END_ACT | |
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Activities |
Medium | 15 | Activities |
Long | 20 | Activities |
Heading | 5 | Actv. |
Documentation
Procedure
Enter the follow-up action which is to be taken when the contract ends. Follow-up actions are
- Creating a contract
- Creating a quotation
- Creating a sales activity such as a telephone call
- Sending an internal electronic mail
If you specify a follow-up action in Customizing in the contract profile, it will be proposed in any contracts you create with this profile. If you also want a date rule to be proposed in the contracts, enter the date rule in the Action date rule field.
If you specify a follow-up action in a contract, the Action date field must be filled either with a date or a date rule. If no date rule is proposed from the contract profile, you must enter either a date or a date rule manually.
Use
All contracts for which follow-up actions have been maintained are included in the follow-up actions worklist when their action date lies within the time period specified for selection. The system lists the contracts by date and follow-up action. You can initiate the follow-up actions directly from the worklist.
Choose Outline agreements -> Contracts -> Subsequent functions -> Follow-up actions to reach the selection screen for the follow-up actions worklist.
History
Last changed by/on | SAP | 19991102 |
SAP Release Created in |