SAP ABAP Data Element VASCH_VEDA (Activity at end of contract)
Hierarchy
☛ BBPCRM (Software Component) BBPCRM
   ⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
     ⤷ VA (Package) Application development R/3 Sales
Basic Data
Data Element VASCH_VEDA
Short Description Activity at end of contract  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type AKTVT    
Data Type CHAR   Character String 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table TVAS    
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name CONT_END_ACT   
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Activities 
Medium 15 Activities 
Long 20 Activities 
Heading 5 Actv. 
Documentation

Procedure

Enter the follow-up action which is to be taken when the contract ends. Follow-up actions are

  • Creating a contract
  • Creating a quotation
  • Creating a sales activity such as a telephone call
  • Sending an internal electronic mail

If you specify a follow-up action in Customizing in the contract profile, it will be proposed in any contracts you create with this profile. If you also want a date rule to be proposed in the contracts, enter the date rule in the Action date rule field.

If you specify a follow-up action in a contract, the Action date field must be filled either with a date or a date rule. If no date rule is proposed from the contract profile, you must enter either a date or a date rule manually.

Use

All contracts for which follow-up actions have been maintained are included in the follow-up actions worklist when their action date lies within the time period specified for selection. The system lists the contracts by date and follow-up action. You can initiate the follow-up actions directly from the worklist.

Choose Outline agreements -> Contracts -> Subsequent functions -> Follow-up actions to reach the selection screen for the follow-up actions worklist.

History
Last changed by/on SAP  19991102 
SAP Release Created in