SAP ABAP Data Element UPP_Y_BUDGET_BTTM_UP_DOCU (Bottom-Up Planning)
Hierarchy
☛
SAP_BW (Software Component) SAP Business Warehouse
⤷ BW-PLA-BPS (Application Component) Business Planning and Simulation
⤷ UPP (Package) SEM-BPS: Planning Processor and Layout Builder
⤷ BW-PLA-BPS (Application Component) Business Planning and Simulation
⤷ UPP (Package) SEM-BPS: Planning Processor and Layout Builder
Basic Data
Data Element | UPP_Y_BUDGET_BTTM_UP_DOCU |
Short Description | Bottom-Up Planning |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR1 | |
Data Type | CHAR | Character String |
Length | 1 | |
Decimal Places | 0 | |
Output Length | 1 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | bottom-up |
Medium | 15 | bottom-up |
Long | 20 | bottom-up |
Heading | 9 | bottom-up |
Documentation
Definition
With the options 'top-down' or 'bottom-up', you determine the summarization logic, if you are working in a hierarchical data model. The nodes of a hierarchy are ready for input in this model, and an end node belongs to every node with lower-level elements, which carries the not yet distributed value (or the 'remaining budget') in budgeting terminology. These end nodes are never ready for input.
- With the option 'top-down' the system behaves as follows: If the value of a node is changed, then the end node change is transported with the 'remaining budget' of the higher-level node.
- With the option 'bottom-up' the system behaves as follows: If the value of an end node is changed, then the values of the end nodes are simply totaled; the values of the end node with the 'remaining budget' does not change. This is only the case if the value of a node with lower-level elements is changed, then the change is updated to the end node belonging to the node with the 'remaining budget'.
You will find further information under the keywords:hierarchical data model, BPS characteristic hierarchies and BW hierarchies with postable nodes.
History
Last changed by/on | SAP | 20130604 |
SAP Release Created in | 3.1B |