SAP ABAP Data Element UMB_Y_TARPER (Target Period)
Hierarchy
☛
SEM-BW (Software Component) SEM-BW: Strategic Enterprise Management
⤷ FIN-SEM-CPM-BSC (Application Component) Balanced Scorecard
⤷ UMB (Package) SEM-CPM: Balanced Scorecard
⤷ FIN-SEM-CPM-BSC (Application Component) Balanced Scorecard
⤷ UMB (Package) SEM-CPM: Balanced Scorecard
Basic Data
Data Element | UMB_Y_TARPER |
Short Description | Target Period |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | UMC_D_FISCPER | |
Data Type | NUMC | Character string with only digits |
Length | 7 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | TargetPer. |
Medium | 15 | Target Period |
Long | 20 | Target Period |
Heading | 0 |
Documentation
Definition
Period with the year to be set as the target by the system.
Supplementary Documentation - UMB_Y_TARPER0000
Use
Dependencies
The setting made here affects all target data, such as value fields with target values (in contrast to current data, such as a value field with an actual or planned value for the current period).
Example
Supplementary Documentation - UMB_Y_TARPER0001
Use
Enter the period up to system changes are to be included in the notification.
Dependencies
Note: If you specified a time variable, the system ignores the period range that you specified for the notification.
Example
History
Last changed by/on | SAP | 20041006 |
SAP Release Created in |