SAP ABAP Data Element TIMEHORIZON (Time Horizon for Material Shortage Calculation)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_GENERAL (Package) PP on HANA: General Functions
⤷ PP-MRP (Application Component) Material Requirements Planning
⤷ PPH_GENERAL (Package) PP on HANA: General Functions
Basic Data
Data Element | TIMEHORIZON |
Short Description | Time Horizon for Material Shortage Calculation |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | TIMEHORIZON | |
Data Type | INT1 | 1-byte integer, integer number <= 255 |
Length | 3 | |
Decimal Places | 0 | |
Output Length | 3 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 5 | Hrzn |
Medium | 10 | Time Hrzn |
Long | 20 | Time Horizon |
Heading | 40 | Time Horizon |
Documentation
Definition
Specifies the time horizon that is taken into account for the calculation of the material shortages in supply and demand matching.
Use
Note that if you select the option Three Workdays, the system calculates this horizon taking account of the factory calendar. If you select one of the options, One Week, Two Weeks, or One Month, the system does not use the factory calendar to calculate this horizon. Instead, the horizon is based on the Gregorian calendar.
Dependencies
Example
History
Last changed by/on | SAP | 20140121 |
SAP Release Created in | 618 |