SAP ABAP Data Element TIMEGRID (Interval specification grid)
Hierarchy
☛
SAP_HRGXX (Software Component) Sub component SAP_HRGXX of SAP_HR
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
⤷ PT-SP (Application Component) Shift Planning
⤷ PP08 (Package) Shift Planning
Basic Data
Data Element | TIMEGRID |
Short Description | Interval specification grid |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | UZEIT | |
Data Type | TIMS | Time field (hhmmss), stored as char(6) |
Length | 6 | |
Decimal Places | 0 | |
Output Length | 8 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Grid |
Medium | 15 | Grid |
Long | 20 | Grid |
Heading | 30 | Grid |
Documentation
Definition
This entry field specifies the interval with which the individual shifts of an enhanced requirements record should be repeated.
Example
A division of an enterprise has the following personnel requirement:
- 08:00 a.m. to 10:00 a.m. - 4 employees
- 10:00 a.m. to 12:00 noon - 6 employees
- 12:00 p.m. to 02:00 p.m. - 5 employees
Specify the raster as follows:
- From 08:00
- To 14:00
- Grid 02:00
- Target 4 (see note below)
By copying the grid you can define the same employee requirements for three different times of the day in one requirements record.
Notes
All of the requirements defined in one grid have the same number of employees (target, minimum and maximum). You can change or modify these separately in the requirements record.
History
Last changed by/on | SAP | 20000104 |
SAP Release Created in |