SAP ABAP Data Element TCJO1ADDKZ (Appended plan update)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
PS-IS-REP-ACC (Application Component) Accounting
⤷
KAP0 (Package) RPSCO recording and infrastructure for this
⤷
⤷
Basic Data
| Data Element | TCJO1ADDKZ |
| Short Description | Appended plan update |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | XFELD | |
| Data Type | CHAR | Character String |
| Length | 1 | |
| Decimal Places | 0 | |
| Output Length | 1 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | Appended |
| Medium | 15 | Appended |
| Long | 20 | Appended |
| Heading | 0 |
Documentation
Definition
Indicator which determines how the plan values for an order/network for the project are included in the plan value for the relevant WBS element.
Use
You can use the "Appended" indicator to determine for a combination of
- order category
- order type and
- controlling area
how the plan values for the order are included with the plan value for the relevant WBS element
- "Appended" indicator set
- The plan value for the order/network is added to the plan value of the WBS element. The sum is displayed in the information system as the project plan.
- "Appended" indicator not set
- The plan value for the order/network is not added to the plan value of the WBS element.
History
| Last changed by/on | SAP | 19950606 |
| SAP Release Created in |