SAP ABAP Data Element TB_FLG_DEBIT_POS_PAYMENT_DATE (Value Date of Debit Position Inclusive)
Hierarchy
EA-FINSERV (Software Component) SAP Enterprise Extension Financial Services
   FS-CML-AC (Application Component) Accounting
     FVVCL_IOA (Package) Calculation of Interest on Arrears for Consumer Loans
Basic Data
Data Element TB_FLG_DEBIT_POS_PAYMENT_DATE
Short Description Value Date of Debit Position Inclusive  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type T_FLG_DEBIT_POS_PAYMENT_DATE    
Data Type NUMC   Character string with only digits 
Length 1    
Decimal Places 0    
Output Length 1    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Deb.Posit. 
Medium 20 Value Date Debit Pos 
Long 36 Value Date of Debit Position 
Heading 36 Value Date of Debit Position 
Documentation

Dependencies

The system calculates the interest on arrears for the period between the date on which the debit position is created for an item and the date on which the item is cleared.

  • In this field you determine whether the value date of the debit position is to be included in this period.
  • You determine whether the date of the incoming payment (value date) is to be included in this period in the Incoming Payment Value Date field.

Example

No tolerance days have been set in the system.

The Incoming Payment Value Date field contains the value Include.

You post an item on the debit side (debit position) as per 05/02.

The incoming payment is made and the open item is cleared on 05/10.

Based on the value entered in this field, the system determines the following period for the interest on arrears calculation:

  • Exclude: 05/03 - 05/10
  • Include: 05/02 - 10/05

History
Last changed by/on SAP  20050109 
SAP Release Created in 600