SAP ABAP Data Element STOPGR6 (Follow-up material)
Hierarchy
☛
ECC-DIMP (Software Component) DIMP
⤷
IS-A-EMM (Application Component) Enhancements to scheduling agreements MM (Outbound)
⤷
ISAUTO_ME (Package) ISAUTO: Purchasing

⤷

⤷

Basic Data
Data Element | STOPGR6 |
Short Description | Follow-up material |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR4 | |
Data Type | CHAR | Character String |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | FM |
Medium | 18 | Follow-up material |
Long | 20 | Follow-up material |
Heading | 32 | Follow-up material |
Documentation
Definition
Indicates that the scheduling agreement release was stopped during the release creation process because a follow-up material will become relevant within the release horizon.
Use
The following characteristics are possible:
@4F@ indicates that a follow-up material is relevant
@00@ indicates that these criteria did not lead to the stop of the SA release
Dependencies
Scheduling agreement releases are dynamically stopped for reasons stored in the release creation profile.
For more information, refer to the documentation of the data element Follow-up Material.
History
Last changed by/on | SAP | 20050301 |
SAP Release Created in | 46C |