SAP ABAP Data Element SRS_PDC_DAYS_BEFORE (SRS MDE Goods Receipt, Days Before Formatting Date)
Hierarchy
EA-RETAIL (Software Component) SAP Enterprise Extension Retail
   LO-SRS (Application Component) SAP Retail Store
     WOST (Package) SAP Retail Store: Internet Application Components
Basic Data
Data Element SRS_PDC_DAYS_BEFORE
Short Description SRS MDE Goods Receipt, Days Before Formatting Date  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type SRS_PDC_DAYS_BEFORE    
Data Type NUMC   Character string with only digits 
Length 2    
Decimal Places 0    
Output Length 2    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 DaysBefore 
Medium 15 Days Before 
Long 34 Days Before Formatting Date 
Heading 34 Days Before Formatting Date 
Documentation

Definition

Start of the preparation period for the selection of goods receipt documents.

The start of the preparation period is calculated for the outbound program runtime by subtracting the number of calendar days stored in the system from the system date.

Use

When the reference documents are downloaded, the open goods receipt documents are selected for a delivery date and written to the interface. Note that in this selection process, the current documents for that day could contain documents that are still open from the past. As not all open documents were selected, you can set a period in SAP Retail Store Customizing for the selection. You can also enter how many days before and after the start date of the outbound program the selection period includes.

Dependencies

Example

History
Last changed by/on SAP  20020107 
SAP Release Created in 110