SAP ABAP Data Element SOMAX (Maximum working time)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PA-PA (Application Component) Personnel Administration
     PBAS (Package) SAP HR Master Data Application Development
Basic Data
Data Element SOMAX
Short Description Maximum working time  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type DEC2_2    
Data Type DEC   Counter or amount field with comma and sign 
Length 4    
Decimal Places 2    
Output Length 5    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Max. time 
Medium 15 Max. wk. time 
Long 20 Max. working time 
Heading Max. 
Documentation

Definition

The maximum planned working time field is used only in time evaluation.

Balances are calculated in time evaluation only up to the maximum daily planned working time. Any attendances outside of this are not included in the calculation.

The maximum working time is entered as a decimal figure.

Supplementary Documentation - SOMAX 0001

Use

The maximum planned working time is only used within positive time recording. Balances are only calculated up to the maximum daily planned working time. The following attendance time is no longer used for the calculation.

Procedure

Example

Dependencies

History
Last changed by/on SAP  19931130 
SAP Release Created in