SAP ABAP Data Element SOBEG (Start of planned working time)
Hierarchy
SAP_HRRXX (Software Component) Sub component SAP_HRRXX of SAP_HR
   PA-PA (Application Component) Personnel Administration
     PBAS (Package) SAP HR Master Data Application Development
Basic Data
Data Element SOBEG
Short Description Start of planned working time  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type UZEIT    
Data Type TIMS   Time field (hhmmss), stored as char(6) 
Length 6    
Decimal Places 0    
Output Length 8    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Work start 
Medium 15 Work Start 
Long 20 Start of plnd work 
Heading 13 Work Start 
Documentation

The planned working time specifies when the employee should start and finish work.

Daily work schedules for flextime are an exception. In this case, the planned working time is the interval within which the employee can clock in and out (recording of actual times).
Working hours which are recorded during this interval are credited to a flextime account. The system automatically interprets excess planned working time as overtime.

History
Last changed by/on SAP  19950403 
SAP Release Created in