SAP ABAP Data Element SMSOK (Start/End of Permitted Start for Processing Step)
Hierarchy
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   SD-BIL-IV-SBI (Application Component) Self-Billing Proced.
     VASB (Package) Application Development R/3 Sales / Self-Billing Process
Basic Data
Data Element SMSOK
Short Description Start/End of Permitted Start for Processing Step  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type BEGINTIME    
Data Type TIMS   Time field (hhmmss), stored as char(6) 
Length 6    
Decimal Places 0    
Output Length 8    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Start/End 
Medium 15 Start/End Proc. 
Long 21 Start/End Processing 
Heading  
Documentation

Definition

Defines the time interval, within which the processing step can be started.

Use

By entering a start and end time, you define the time of day when processing of a self-billing transmission can be started.

This enables you to ensure, for example, that self-billing documents are only processed outside of normal business hours.

Procedure

Examples

You specify a start time of 20:00:00 and an end time of 05:00:00, because the majority of users are not using the system between these times.

Dependencies

When the system dispatches the processing step (calculating the start time, for example, from the date/time of transmission and the delay for the processing step (see EDI processing parameters), it checks whether the resulting start time falls within the interval specified here. If it falls outside of this interval, the system automatically postpones the start to the next possible point in time.

Example

  • The permitted interval is from 20:00:00 to 05:00:00.
  • A transmission is created on 01.10.1999 at 23:55:00.
  • The delay set in the processing parameters for the EDI partner is 12 hours.

The system therefore calculates a start time of 11:55:00 on 02.10.1999 (12 hours after creation).

Since 11:55:00 is not within the permitted time interval between 8pm and 5am, the system sets processing to start at 20:01:00 on 02.10.1999.

Note:

This can lead to a large number of transmissions set for processing at the start of the permitted time interval.

History
Last changed by/on SAP  20030411 
SAP Release Created in