SAP ABAP Data Element SLFUT (Future period for planned transactions)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-MD-PCT (Application Component) Product Catalog
⤷
WBBC (Package) IS-R: Replenishment list

⤷

⤷

Basic Data
Data Element | SLFUT |
Short Description | Future period for planned transactions |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | NUM4 | |
Data Type | NUMC | Character string with only digits |
Length | 4 | |
Decimal Places | 0 | |
Output Length | 4 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 10 | Fut.period |
Medium | 16 | Future period |
Long | 20 | Future period |
Heading | 4 | FutP |
Documentation
Definition
In the same way as for the allocation table, the future period defines the period (in days) in the future in which documents are taken into account for planned logistic transactions.
Example
All allocation tables for the next 14 days should be taken into account.
History
Last changed by/on | SAP | 20010607 |
SAP Release Created in |