SAP ABAP Data Element SLFUT (Future period for planned transactions)
Hierarchy
BBPCRM (Software Component) BBPCRM
   CRM-MD-PCT (Application Component) Product Catalog
     WBBC (Package) IS-R: Replenishment list
Basic Data
Data Element SLFUT
Short Description Future period for planned transactions  
Data Type
Category of Dictionary Type D   Domain
Type of Object Referenced     No Information
Domain / Name of Reference Type NUM4    
Data Type NUMC   Character string with only digits 
Length 4    
Decimal Places 0    
Output Length 4    
Value Table      
Further Characteristics
Search Help: Name    
Search Help: Parameters    
Parameter ID   
Default Component name    
Change document    
No Input History    
Basic direction is set to LTR    
No BIDI Filtering    
Field Label
  Length  Field Label  
Short 10 Fut.period 
Medium 16 Future period 
Long 20 Future period 
Heading FutP 
Documentation

Definition

In the same way as for the allocation table, the future period defines the period (in days) in the future in which documents are taken into account for planned logistic transactions.

Example

All allocation tables for the next 14 days should be taken into account.

History
Last changed by/on SAP  20010607 
SAP Release Created in