Hierarchy
⤷ BC-CUS-TOL-NAV (Application Component) Business Navigator
⤷ SDFM (Package) Maintenance of Reference Structure and Processes
Basic Data
Data Element | SEQN |
Short Description | Sequential number for determining sequence |
Data Type
Category of Dictionary Type | D | Domain |
Type of Object Referenced | No Information | |
Domain / Name of Reference Type | CHAR10 | |
Data Type | CHAR | Character String |
Length | 10 | |
Decimal Places | 0 | |
Output Length | 10 | |
Value Table |
Further Characteristics
Search Help: Name | ||
Search Help: Parameters | ||
Parameter ID | ||
Default Component name | ||
Change document | ||
No Input History | ||
Basic direction is set to LTR | ||
No BIDI Filtering |
Field Label
Length | Field Label | |
Short | 0 | |
Medium | 0 | |
Long | 0 | |
Heading | 0 |
Supplementary Documentation - SEQNA 1700
Use
If the text takes up several lines, each line is assigned a sequential number.
Procedure
Examples
Dependencies
Supplementary Documentation - SEQNO_512E0001
Use
You use the group and subgroup to determine in which order the information in the window is printed. All the information within a window, belonging to the same group and subgroup, is printed sequentially.
Supplementary Documentation - SEQNP 0001
Use
You can make several entries for one wage type.
This allows you to assign a wage type to several windows, and to cumulate a wage type in different wage types.
Procedure
Example
Dependencies
Supplementary Documentation - SEQNP 0002
Use
Enter a sequential number to define the order of wage types in the group.
Procedure
Example
Dependencies
Supplementary Documentation - SEQNP 0003
Use
You can use sequential numbers to store several consecutive breaks for one break schedule.
Procedure
Examples
Dependencies
Supplementary Documentation - SEQNP 0004
Use
A daily work schedule selection rule can consist of several individual rules. The individual rules are numbered sequentially.
The system works through the rules sequentially until it finds one which is appropriate.
Please note: Subsequent rules are not processed.
Procedure
Examples
Dependencies
Supplementary Documentation - SEQNP 0005
Use
The sequential number allows you to define the order in which the fields for the organizational key are called.
Procedure
Examples
Dependencies
Supplementary Documentation - SEQNU 0003
Use
T52C2
Procedure
Examples
Dependencies
Supplementary Documentation - SEQNU 0004
Use
T52C3
Procedure
Examples
Dependencies
History
Last changed by/on | SAP | 19961104 |
SAP Release Created in |