SAP ABAP Data Element SEC_F_AN (Scale factor evaluation follow-up/planning horizon)
Hierarchy
☛
SAP_APPL (Software Component) Logistics and Accounting
⤷
PP-CRP-LVL (Application Component) Capacity Leveling
⤷
CY03 (Package) R/3 Appl. Dev.: Control Station Resource Planning (SFC)
⤷
⤷
Basic Data
| Data Element | SEC_F_AN |
| Short Description | Scale factor evaluation follow-up/planning horizon |
Data Type
| Category of Dictionary Type | D | Domain |
| Type of Object Referenced | No Information | |
| Domain / Name of Reference Type | DEC8_2 | |
| Data Type | DEC | Counter or amount field with comma and sign |
| Length | 10 | |
| Decimal Places | 2 | |
| Output Length | 13 | |
| Value Table |
Further Characteristics
| Search Help: Name | ||
| Search Help: Parameters | ||
| Parameter ID | ||
| Default Component name | ||
| Change document | ||
| No Input History | ||
| Basic direction is set to LTR | ||
| No BIDI Filtering |
Field Label
| Length | Field Label | |
| Short | 10 | FactEvF/up |
| Medium | 15 | FactEvalFoll/up |
| Long | 20 | FactorEvalFollow-up |
| Heading | 13 | FactEvalF/up |
Documentation
Definition
Gives the relationship of the scale for the evaluation lead-time offset and the planning horizon to one another. The relationship is given in percentage terms.
Supplementary Documentation - SEC_F_AN 0001
Use
Procedure
Examples
You chose 40mm (= 4 cm) per day as a scale for the time fence. If you enter 20.00 (%) for the relationship then the scale for the evaluation follow-up is: 40 mm * 20 % - 8 mm, that is, 0.8 cm per day.
Dependencies
History
| Last changed by/on | SAP | 19950825 |
| SAP Release Created in |